Simulating Flood Hazard in Wye Valley during Storm Dennis using Hec-Ras
E. Andrews, S. Pan
Chapter from the book: Spezi E. & Bray M. 2024. Proceedings of the Cardiff University Engineering Research Conference 2023.
Chapter from the book: Spezi E. & Bray M. 2024. Proceedings of the Cardiff University Engineering Research Conference 2023.
A 2D Hec-Ras flood model is established at the middle reach of the River Wye, from Ross-on-Wye to Monmouth, along the English-Wales border. The flow conditions during Strom Dennis, which occurred on 15-16 Feb 2020 are used to simulate the flood extents in the study area. The flood hazard rate, suggested by EA, is analysed to assess the risk level of flooding in the area. The results show the extensive flood extents at the study site. The flood hazard rate map shows that large part of Wye Valley is at high risk of flooding.
Andrews E. & Pan S. 2024. Simulating Flood Hazard in Wye Valley during Storm Dennis using Hec-Ras. In: Spezi E. & Bray M (eds.), Proceedings of the Cardiff University Engineering Research Conference 2023. Cardiff: Cardiff University Press. DOI: https://doi.org/10.18573/conf1.s
This chapter distributed under the terms of the Creative Commons Attribution + Noncommercial + NoDerivatives 4.0 license. Copyright is retained by the author(s)
This book has been peer reviewed. See our Peer Review Policies for more information.
Published on May 1, 2024